100kV Phuoc Dong- Boi Loi Substation.

Project: 110Kv Phuoc Dong- Boi Loi Substation

Performing year: 2013

Unit: Southern Power Corporation

Scope of supply: Supplying equipment for 110/220kV substation: CB, DS, lightning arrestor, CT,VT, insulator’s supporting frame, 24kV compact cabinet, batteries and charge cabinet, OPGW fiber cable, bus-bar accessories, control and procteion cable, steel structure, installation and inspection services, connection supplies ( insulator, accessories), SACDA & Telecommunication system and service.

 

Newer news items:

Older news items:

  • 110kV Phu Quoc Substation- National important project

    110kV Phu Quoc Substation- National important project

       
  • 110kV Tan An Subtation

    110kV Tan An Subtation

    Project: 110kV Tan An Subtation Performing year: 2012 Unit: Southern Power Corporation Scope of supply: Supplying equipment for 110/220kV station: CB, DS, lightning arrestor, CT,VT, insulator’s supporting frame, 24kV compact cabinet, supporting structure, clamp and enlosed accessories,…
  • 110kV Moc Hoa Substation

    110kV Moc Hoa Substation

  • Tra Vinh 220KV Substation Project

    Tra Vinh 220KV Substation Project

    Year of project: 2012. Main Contractors: TOSHIBA and SOUTHERN POWER CORPORATION. Scope of supply: Control and protection cabinet, information systems, installation and testing of SAS system.
  • Cho Moi 110kV substation project

    Cho Moi 110kV substation project

    Name of Package/Project : cho moi 110kV substation Year of project : 2012 Main Contractors: Southern Power Corporation Scope of supply: Supply substation material and equipment for 110/22KV S/S including Circuit Breaker, Disconnecting Switches, Surge Arrester, Current Transformer, Voltage Transformer, Post Insulator